Measures for Controlling Time and Cost Overrun Factors during Execution Stage

Nadzirah Roslan, Noor Yasmin Zainun, Aftab Hameed Memon

Abstract


This study identified measures for controlling time and cost overrun factors since many projects are experiencing time and cost overrun which caused by exceeding schedule and budget of the projects. It is focusing for controlling time and cost overrun during execution stage of construction project in southern region of Malaysia. The controlling measures as identified from comprehensive literature review are related to the critical factors of time and cost overrun during the execution stage. Average Index (AI) method was adopted for the data analysis. It is hoped this study will assist the practitioners in selecting the most effective mitigation measure for the factor of time and cost overrun being faced in their particular projects.


Full Text:

PDF

Refbacks

  • There are currently no refbacks.


Copyright © 2013 Zero Waste Publisher

To make sure that you can receive messages from us, please add the 'zwgm.org' domain to your e-mail 'safe list'. If you do not receive e-mail in your 'inbox', check your 'bulk mail' or 'junk mail' folders.